A view of the inside of the Dragon
Brewery. This is the largest building I have made to date. It features:
removable beer vats and the whole office section on the right is also removable
to allow access to the under section. This was a very satisfying model to design
and build. It was built over a four week period and then took Heidi a further
week to paint it. Top Job though. I will feature more shots of this building in
the Scenery Gallery.
Figures and scenery by Tim
Click on image to return
|